FLK CE High Quality Heat Shrink Wrap Film Supplies
Heat Shrink Wrap Technical
1 |
Inlet size |
1000*400mm |
2 |
Heating tube |
18pcs |
3 |
Power supply voltage |
380v/50Hz |
4 |
Heater Power |
14.4kw |
5 |
motor power |
700w |
6 |
Loading weight for tunnel |
85kg |
7 |
Adjustment speed |
Frequency Control |
Heat Shrink Wrap Description
1) This FSM shrink film packing machine adopts electric temperature controller, can adjust from common temperature to 300.
2)It uses infrared ray quartz tube with high quality to be heating system and imported tube of high power to be step-less speed regulation , stable electricity, ensure the stable of convey .
Heat Shrink Wrap Packing foam:
1 pcs 1 pack ,3pcs bottle one pack, 2box one pack,6pcs bottle one pack etc
The Heat Shrink Wrap instruction as follows:
1. Invert speed control.
2. Double air blowers, guarantees the temperature balance in the shrink stove with PAD temperature controller that apparently saves energy.
3. It applies wing shape stainless steel heating system, which is durable for long time use.
4. The heatproof Bolivian filament special fluorine dragon transportation net belt is used in shrink part to ensure the steady of transportation and high strengthen wear proof.
5. This machine applies invert speed control net belt conveying mechanism.
6.. The height of the conveyor shall be made towards client's demand.
7. The direction of bottle entering can be adjusted according to client's demand
8. According customer request, can make the stainless steel belt inside the shrink tunnel instead of plastic belt
Heat Shrink Wrap Detail Picture
Other type of Heat Shrink Wrap
In Addition to Heat Shrink Wrap we have cosmetics cream making machine , vacuum emulsifying machine , shampoo mixing machine , filling machine , labeling machine , inkjet print , and etc.
Heat Shrink Wrap Our Services
Warranty time: one year, from the date which the product is qualified commissioning. Any damage except the wrong operation during warranty period is repaired freely. But the travel and hotel expenses should be count on buyer.
Commissioning services: the product's installation and commissioning at the demand side, our engineers will not leave there untill get your agreement.
Training services: our engineers will train your staff to operate it during the period of installation and commissioning, and they will not leave there until your staff can operate it properly and normally.
Maintenance services: any malfunction happened, once you enquiry us, we will reply you within 48 hours except the special reasons.
Lifelong services: we provide lifelong services for all the products we sold out, and supply the spare parts with discount price.
Certificate services: we can provide related certificates to customers freely according to the request of customers.
Inspection services: you can ask the third part inspection company or your inspector to inspect the products before shipment.
The file: the Manual Specification, report of the material which used to the equipment and others documents related to the GMP authentication information will be provided by us.